Septic

Septic system quote comparison worksheet

Use this worksheet to compare septic system bids against the same scope, assumptions, and project conditions.

Planning range $7,500 - $26,000 per project Use the range as context, then compare each bid line by line.

Keep every bid on the same assumptions

Start with the same project description, cost drivers, expected materials, access notes, and timeline for each contractor. The biggest drivers for this project are bedroom count, system type, soil condition, and excavation access.

Back to calculator

Scope comparison

Assumption Question to ask Bid 1 notes Bid 2 notes Bid 3 notes
Project scope What is included in each septic system bid, and what would be billed separately?
Bedroom count How does each contractor account for bedroom count?
System type How does each contractor account for system type?
Soil condition How does each contractor account for soil condition?
Excavation access How does each contractor account for excavation access?

Bid terms to compare

Bid item What to compare Bid 1 notes Bid 2 notes Bid 3 notes
Included work Labor, standard materials, preparation, cleanup, and disposal included in the price.
Allowances and exclusions Items priced as allowances, excluded work, or conditions that could change the final price.
Permits and code work Permit handling, inspection requirements, code upgrades, and who pays for surprises.
Schedule and payment terms Start date, timeline, deposit, progress payments, final payment, and cancellation terms.
Warranty and cleanup Labor warranty, material warranty, site protection, cleanup, and haul-off responsibilities.

Before you choose a contractor

Ask each contractor to price the same scope, materials, cleanup, warranty, and change-order rules. A low bid is only useful when you know what is included and what can change later.