Sewer line replacement quote comparison worksheet
Use this worksheet to compare sewer line replacement bids against the same scope, assumptions, and project conditions.
Keep every bid on the same assumptions
Start with the same project description, cost drivers, expected materials, access notes, and timeline for each contractor. The biggest drivers for this project are line length, replacement method, pipe condition, and pipe depth and access.
Scope comparison
| Assumption | Question to ask | Bid 1 notes | Bid 2 notes | Bid 3 notes |
|---|---|---|---|---|
| Project scope | What is included in each sewer line replacement bid, and what would be billed separately? | |||
| Line length | How does each contractor account for line length? | |||
| Replacement method | How does each contractor account for replacement method? | |||
| Pipe condition | How does each contractor account for pipe condition? | |||
| Pipe depth and access | How does each contractor account for pipe depth and access? |
Bid terms to compare
| Bid item | What to compare | Bid 1 notes | Bid 2 notes | Bid 3 notes |
|---|---|---|---|---|
| Included work | Labor, standard materials, preparation, cleanup, and disposal included in the price. | |||
| Allowances and exclusions | Items priced as allowances, excluded work, or conditions that could change the final price. | |||
| Permits and code work | Permit handling, inspection requirements, code upgrades, and who pays for surprises. | |||
| Schedule and payment terms | Start date, timeline, deposit, progress payments, final payment, and cancellation terms. | |||
| Warranty and cleanup | Labor warranty, material warranty, site protection, cleanup, and haul-off responsibilities. |
Before you choose a contractor
Ask each contractor to price the same scope, materials, cleanup, warranty, and change-order rules. A low bid is only useful when you know what is included and what can change later.